电脑版产品中心大图

current location: > > SMLS STEEL PIPE

Tube for conveyance of fluid

Tube for conveyance of fluid

WhatsApp: +86 13231721616

Tel: +86 317 6899800

E-mail: hypipe@hbhuayang.com


FREE GET QUOTE


TUBE FOR CONVEYANCE OF FLUID

 

For conveying oil,gas and other fluid.

Standard

Material Grade

GB/T8163

10#,20#,Q345A,Q345B,Q345C,Q345D,Q345D,Q345E

GB/T5310

20G, 25MnG, 15MoG, 15CrMoG, 12Cr2MoG, 12Cr1MoVG

ASTM A53

GR.A,GR.B

ASTM A106

GR.A,GR.B,GR.C

JIS 3454

STPG 370,STPG 410

JIS 3455

STS 370,STS 410,STS 480

1.Manufacturing process

Hot rolling process:steel billet → heating → punching → three-roller skew rolling → tube knockout → tube diameter reducing → cooling → semi-finished pipe → straightening→ Hydraulic test →UT→ labeling → warehouse entry.

Cold drawn process: Steel billet → heating → punching → head making → annealing → pickling → copper plating → cold drawing → semi-finished pipes → heat treatment → straightening → water pressure test → labeling → warehouse entry.

2.OD:33.4mm--508mm (1"o 20")
3.WT: 2mm-50mm
4.Length: Random Length, Fixed Length, SRL,DRL

5.Surface Treatment:  Oil Varnish, black anti-rust paint, hot-dip galvanized,3PE,2PP,2PE,FBE,etc
6.Packing: Sea package,woven bags, plastic end,in bundled with lifting belts

7.Ends Design: Beveled ,Plain,Threaded with coupling,Grooved,Square cutted

8.Special Design available according to customers requirement

9.Quality Guarantee: SGS,BV,Lloyd's,DNV,Moody,etc.

10.Cooperative Partner: Tianjin Pipe Group Corporation(TPCO),Shougang Group, Baosteel Group,Han-Steel Group,Hengyang Valin Steel Tube Co.,Ltd(HYST) and Etc

10. Project :

Oil and Natural Gas pipeline:Water Conveyance Pipeline,Airport Construction,Railway station Bridge Construction :Power Project and Etc

More details Please see the Project Part.

 

CONTACT US

  • *
*
  •  Code